--- name: plan description: Use after design approval for milestone plans with executable acceptance. --- # Plan `docs/staging/plans/YYYY-MM-DD-<topic>.md`. Reference the spec; don't restate it. If unresolved spec notes affect implementation or task order, return to `design`. ## Multi-module plan If `topology=multi-module` (triage announcement or coordinator spec/plan declaration), read `../references/multi-module.md`. Open the workspace plan with the declaration block (`topology: multi-module`, `change-set`, `coordinator`, `repos`, module plan paths, integration task) - it is the on-disk mode marker downstream skills rely on. - Write the workspace plan in the coordinator repository and a module plan in every affected module's owning repository. - The workspace plan lists the change-set ID, coordinator, repositories, module plan paths, and the integration task. - Every task names exactly one `repository:` and one `module:`. Cross-module verification is an `integration` task owned by the coordinator. - Order contract tasks before consumers, local acceptance before integration, and integration before linked commits. - Mark tasks parallel only when they have independent write scopes and acceptance. - Adding a repository after implementation starts: update the declaration block and confirm with the user. Return to `design` only if the addition changes a shared contract. ## Rolling wave Spec references a milestone (`milestone: MN`)? Check `docs/ROADMAP.md` — expand only that milestone. Leave the rest as stubs. After `ship`: open `docs/ROADMAP.md`, confirm which milestone is next, then expand it. Return to `design` only if the milestone's goal materially changed. ## Milestone tasks (30-60 min each) Every task is `- [ ] T<n>: <name>` - always a checkbox, never a heading. `tdd`/`subagents` flip it to `- [x]` on completion; `ship` refuses to run while any `- [ ]` remains. ``` goal: <one sentence> files: <paths> acceptance: <test or cmd> spec: <docs/staging/specs/...#anchor> ``` No exact code. No step-by-step. Acceptance is verifiable: a test, command, or scripted check — or, when none is possible, an explicit manual check (steps + expected result). Each task leaves the repo green. Mark independent tasks: `[parallel] T3, T4, T5`. Only mark `[parallel]` when shared contracts, state, errors, and acceptance are closed. **Atomic expansion is deferred until dispatch time** - `subagents` expands a milestone into 2-5 min steps at dispatch time, not here. for **New project**: derive an initialization task — scaffold code, tests, CI, and always include: `README.md`, `CHANGELOG.md`, `.gitignore`, and a `Makefile` (or equivalent task runner config). ## Don't put in the plan background, architecture, rationale (spec), CI commands, copy-pasted acceptance. ## Hand off `<gate>` The plan must exist on disk before handing off to `tdd`/`subagents`. For multi-module work, this means the coordinator workspace plan and every affected module plan in its owning repository. `</gate>` Confirm plan with the user. mostly `[parallel]` → `subagents`. Otherwise → `tdd`.