HOL LogoGuard

Explore HOL

  • HOL home
  • AI agent registry
  • AI plugins
  • Open standards
  • HOL members
  • Sponsor HOL
  • Advertise with HOL

Guard product

  • Guard overviewLocal security and control for AI agents and the tools they use.
  • FeaturesRuntime protection, policy routing, review, and evidence.

Explore Guard

  • Product previewWalk through Guard surfaces in read-only demo mode.
  • ComparisonCompare Guard with native controls and AI security vendors.

AI tools

  • All AI toolsEvery supported AI tool and how Guard applies policy to it.
  • Codex
  • Claude Code
  • Cursor
  • Antigravity CLI
  • OpenCode
  • Hermes
  • OpenClaw
  • GitHub Copilot CLI
  • Antigravity
  • Kimi
  • Grok
  • Pi / Oh My Pi
  • Zcode

Extensions

  • All extensionsBrowse command and MCP coverage with owners and stated limits.
  • Command coverageShell command protection across clouds, databases, backups, and packages.
  • MCP server coverageSee how Guard maps risk state across MCP tools and servers.
  • Core safetyThe safety floor listings that ship with Guard.
  • Data and resilienceBackup and storage command protection.
  • Cloud and infrastructureAWS, Azure, GCP, Kubernetes, and more.

Security

  • AI security hubSecurity research, advisories, and agent safety coverage.
  • AI tool securitySecurity profiles for each supported coding agent.
  • Safe labsHands-on attack simulations with safe boundaries.
  • Redacted warningsReal blocked actions with sensitive details removed.
  • AdvisoriesCoordinated disclosure reports for AI tooling.
  • Active CVEsSearch active CVEs affecting AI tooling.

Learn

  • Security guidesPractical guides for securing AI agent workflows.
  • DocsInstall, configure, and operate Guard with confidence.
  • ResearchPublished security research, benchmarks, and methodology.

Community

  • ReleasesVersion history, shipped changes and upgrade notes.
  • ContributorsThe people and contributions behind HOL Guard.
  • AffiliatesShare Guard with your audience and earn from referrals.
  • SponsorFund agreed research, implementation and shared testing through the HOL Partner Program.
  • AdvertiseCompare README logo placements, previews and monthly prices, or promote a plugin or extension.
PricingEnterpriseOpen AppInstall Guard
  1. Guard
  2. Security
  3. CVEs
  4. CVE 2020 15109 ability to change order address without
HOL Guard

Public security guidance for teams protecting AI harnesses, MCP servers, skills, prompts, and local tool execution.

Install Guard

AI Security

  • Prompt injection
  • MCP security
  • OWASP MCP mapping
  • Supply chain

Resources

  • Trust packet
  • Harness setup
  • Redacted warnings
  • Safe labs

Product

  • Install Guard
  • Pricing
  • Open dashboard
Guard
  • Guard Overview
  • Releases
  • Contributors
  • Install Guard
  • Pricing
Docs
  • Documentation Index
  • Developer Hub
  • API Reference
  • Root OpenAPI
  • Registry OpenAPI
  • Run in Postman
  • Standards
  • Submit ERC-8004 Contract
  • Feature Your Agent
Best Plugins
  • Browse Plugins
  • Plugin Launches
  • Best Claude Plugins
  • Best Codex Plugins
  • Best Grok Plugins
  • Best Kimi Plugins
  • Best DeepSeek Plugins
  • Best Antigravity Plugins
  • Best MCP Servers
  • Best Cursor Plugins
  • Best OpenCode Plugins
Best Agents
  • Best ERC-8004 Agents
  • Best Virtuals Agents
  • Best MCP Servers
  • Best A2A Agents
  • Best x402 Payable
  • All Categories
Community
  • Telegram
  • X
More
  • About HOL
  • Sponsor
  • Advertise
  • Contact
  • Blog
  • GitHub
  • Privacy
  • Terms of Service
Settings

Copyright © 2026 HOL DAO LLC. All rights reserved.

Back to active CVEs
Medium · CVSS 5.3CVE-2020-15109GHSA-3MVG-RRRW-M7PH

Ability to change order address without triggering address validations in solidusCVE-2020-15109

Answer in brief

CVE-2020-15109 records a Medium severity (CVSS 5.3) vulnerability in Ability to change order address without triggering address validations in solidus. The current sources do not mark it as known exploited. The current feed maps solidus_api (rubygems), solidus_api (rubygems), solidus_api (rubygems), solidus_frontend (rubygems) and additional mapped packages. Check affected ranges and fixed versions before updating.

Analysis pending evidence review

HOL Guard separates source facts from reviewed analysis. See the methodology.

Published Aug 4, 2020Updated Sep 10, 2026Source checked Oct 25, 2026First seen by HOL Aug 7, 2026Material review Sep 10, 2026
Upstream Advisory

Key facts

Risk
Medium · CVSS 5.3
Exploitation
Not marked as known exploited
Affected software
6 mapped packages or products
Fix availability
Available

Why this deserves its current priority

CVSS is 5.3. The current sources do not mark it as known exploited. Treat this as a source-backed prioritization signal, not a statement about your environment.

Analysis status

Analysis pending evidence review

Factual feed record only; HOL analysis is not approved for indexing. Read the methodology.

Affected scope and exposure questions

The current feed maps solidus_api (rubygems), solidus_api (rubygems), solidus_api (rubygems), solidus_frontend (rubygems) and additional mapped packages. Check affected ranges and fixed versions before updating.

Mapped affected packages and fixed versions
PackageAffected rangeFixed version
solidus_apirubygems>=0 <2.8.62.8.6
solidus_apirubygems>=2.9.0 <2.9.62.9.6
solidus_apirubygems>=2.10.0 <2.10.22.10.2
solidus_frontendrubygems>=0 <2.8.62.8.6
solidus_frontendrubygems>=2.9.0 <2.9.62.9.6
solidus_frontendrubygems>=2.10.0 <2.10.22.10.2

Recommended response

  1. 1Check inventory. Check lockfiles and deployed manifests for solidus_api, solidus_api, solidus_api.
  2. 2Review the reported fix. Update solidus_api to 2.8.6; solidus_api to 2.9.6; solidus_api to 2.10.2; solidus_frontend to 2.8.6; solidus_frontend to 2.9.6; solidus_frontend to 2.10.2 if you use the affected versions. Test the change in a non-production environment first.

Evidence timeline and material changes

  1. Published upstream

    Aug 4, 2020

    Evidence: source:osv:source_dates:source-dates:record
  2. Source modified

    Sep 10, 2026

    Evidence: source:osv:source_dates:source-dates:record
  3. First seen by HOL

    Aug 7, 2026

Sources and claim methodology

  • GitHub security advisorygist.github.com
  • GitHub security advisorygithub.com
  • GitHub security advisorygithub.com
  • GitHub security advisorygithub.com
  • GitHub security advisorygithub.com
  • NVD vulnerability recordnvd.nist.gov
  • Source referencesolidus.io
Upstream source description

### Impact This vulnerability allows a malicious customer to craft request data with parameters that allow changing the address of the current order without changing the shipment costs associated with the new shipment. All stores with at least two shipping zones and different costs of shipment per zone are impacted. E.g. 1. Store admin configured the store so that there are two zones in US: - East Cost Zone - Shipping Method cost: $1 - West Cost Zone - Shipping Method cost: $10 The attacker user can know that shipping to NY is less expensive than to LA just by testing different addresses in checkout. 2. The attacker user enters any NY shipping address in the address step 3. The attacker user chooses the $1 delivery option 4. The attacker user crafts a request with their real LA address, similar to: ``` // POST #checkout/update: { state: 'payment', order: { ship_address_attributes: { city: 'Los Angeles', ... } } } ``` 5. The attacker user proceeds with checking out with a new address and the $1 shipment costs. Another scenario where this could be dangerous is: > You cannot ship products in some zones and you are relying on Solidus Shipping Method building only to filter out unwanted zones. Malicious users can enter an allowed zone's address and change back to an unwanted one in the payment step by crafting a request with some proper ship_address_attributes. This problem comes from how checkout permitted attributes are structured. We have a single list of attributes that are permitted across the whole checkout, no matter the step that is being submitted. ### Patches A PR has been attached to fix the security concern for each of all the Solidus supported versions following the rules of the [Solidus Security Policy](https://solidus.io/security). ### Workarounds When it's not possible to upgrade to a supported patched version, please use this gist to patch the store: https://gist.github.com/kennyadsl/4618cd9797984cb64f7700a81bda889d

Quoted source text, attributed separately from HOL analysis.

Record context

Vulnerability class
Vulnerability
EPSS
Not reported
CWE IDs
Not reported
Source
OSV
Source checked
Oct 25, 2026
References
7 linked sources
Open source record